Thursday, 26 April 2012

Finished Music Video

I have now finished editing my music video, by adding the final clips to the remaining time I had left to fill; and exported it as a Quicktime movie. This means all I now need to do is complete my evaluation which I have decided to do in the form of a video in Windows Movie Maker.

Thursday, 19 April 2012

Editing Further

I am almost finished my music video, and I have roughly 20 seconds left of the track to edit footage over. Other than this, I just need to complete my evaluation for the deadline. I have been editing parts of my music video today in the lesson and added sections of lip syncing that I have filmed most recently.


Wednesday, 18 April 2012

Colour Correcting

Today I watched some video clips on how to colour-correct footage in Final Cut. The video showed how to correct the colour levels and white balance in either one clip or many clips, so that all footage in the video matches, and so that it does not look washed out. I also watched a clip showing how to make footage in Final Cut look more cinematic. Once I have finished my music video, I will apply these techniques to make sure that all my footage looks more professional.

Tuesday, 17 April 2012

Finishing Coursework

I have nearly finished editing together my music video, adding in pieces from the footage that I filmed of Connor lip syncing. We have been given a definite deadline of the 4th May 2012 to finish our coursework, including our up-to-date blogs, both ancillary tasks, the completed music video and evaluation. This leaves me with approximately three weeks to complete everything; which is realistic and a deadline which I think I will be able to easily meet, as my music video is very nearly finished, my ancillary tasks are done, and my blog is up to date. The main task I need to focus on is the evaluation, which I plan to make using movie maker to make the evaluation more interesting and clear to watch.

Monday, 2 April 2012

Filming

I filmed with Connor as planned and got footage of him lip syncing in an outdoor location. I got 12 minutes worth of footage for this, as I repeated it several times to make sure I got shots which looked good. I only need approximately 30 seconds worth of this footage for the video, and I am going to edit this next, as I have come into school today in the Easter Holidays so that I can edit it before we come back after the holidays. This means that if I finish it today, I will be able to work on my evaluation over the holidays also.

Thursday, 29 March 2012

Planning to Film

As I had to postpone my filming with Connor due to bad weather, I have rearranged it for this Sunday (1st April) which is forecast to be good weather. I have also planned to come into school on the Monday (2nd April) to edit what I film on that day together in my music video so that I will possibly be able to finish the entire video. If I still need to film more after the Monday, then I have the easter holidays to do this; and I can also come into school on another Monday (16th April) which is still in the holidays.

Continuing to edit 9

I have also edited part of the next chorus after the instrumental I have already edited together of the band footage. I have used my chalkboard footage again, and using the cross dissolve transition; I have also added quick shots of the band performing between each line of the chorus. I have used the cross dissolve transition between the shots because the shots of the band are so short that it would look too rushed if they did not have a transition at all; as with the cross dissolve they fade in and fade out smoothly with the chalkboard shots.


I also added more chalkboard footage after this, using the cross dissolve transition again to overlap two different pieces of text but so that they run smoothly together. I also did this because the & symbol on one of the pieces of text is only for a very short length of time, so using the cross dissolve made it fade out slower, but to still have the new text coming in before it has fully gone. In this section of the music video I have used quite a lot of the chalkboard footage compared to the rest of the music video. The reason for this is because I am going to mainly use footage of the actors in the music video for the rest of it. When I film with Connor for the remaining few shots for my video, these are what will be filling in all of the gaps I have left whilst editing. 


Friday, 23 March 2012

Continuing to Edit 8

After having filmed with Joanna, I imported the footage I collected onto my mac and edited sections of it into my music video. I put parts of this into the chorus, but had to leave gaps of where I wanted to put the new footage I am hoping to film of Connor in the Easter holidays. I have also edited the instrumental part of my music video using the band footage I filmed a while ago. I am pleased with this editing and section of my music video, and once I have filmed with Connor I will have all of the footage I need to complete the editing of my music video. I will then need to look at my chosen music channel, which is Kerrang, to see what I will need to add to my music video to make it look like it is shown on that channel, for example a background logo in the corner of each frame etc.

Wednesday, 21 March 2012

Todays Filming

I am still going ahead with filming today with Joanna at about 4pm, to film various shots of her by herself rather than being with Connor or Matthew. This should only take about half an hour to one hour, and I will be doing this in daylight to get the best natural lighting.

Tuesday, 20 March 2012

Postponing Filming

I have had to postpone the filming I was meant to do on Sunday with Connor due to the weather, as it was raining most of the day and this would effect continuity. As Connor is only available at the weekends/school holidays, I will have to wait until the easter holidays to film, and focus on editing the rest of the footage so that this is the main part I will have left to edit when we come back after the holidays. I am on Duke of Edinburgh expedition this weekend coming up, so this is why I will have to film in the holidays.

However, I am still filming with Joanna wednesday after school at 4pm, and I have looked at the weather forecast and it is supposed to be sunny, so there shouldn't be any reasons why I do not film on this day.

Thursday, 15 March 2012

Arranging to Film the Rest of my Footage

I have contacted Connor and Joanna about filming the rest of the footage for my music video. I have arranged to film this Sunday afternoon with Connor for approximately an hour, and I have arranged with Joanna to film one day after school next week while it is still light. On Sunday, I am planning on filming Connor lip syncing in outdoor locations to different parts of my song.  With Joanna I am planning on filming various shots of her walking in outdoor locations. I also may need to film with Matthew again next week however I will arrange this after filming with Connor and Joanna as I will have a better idea of what I will need to film.

Wednesday, 7 March 2012

Watching Through Footage

I have watched back my footage from my music video so far, as I have to film more footage before I can continue editing. I have added several transitions into the music video, and also taken some out so that I don't overuse transitions between the shots. I am not happy with all of my footage which is in my music video, however I am unable to film the same shots again due to actors or locations not being available before my deadline. Therefore I will have to use the best footage I have got, or use video filters to add an effect to remove any out of focus shots or grain in the video. I have edited half of my music video together at this point.

Whilst watching my footage back, I made it so that it was full screen; in doing this, I noticed that it was much more grainy than I originally thought and was quite pixelated. Although this is a problem, there is nothing I am able to do about it and therefore I will have to leave it as it is unfortunately.

At my next filming session, I am going to film Connor lip syncing to some of the verses in the second half of the song, and the chorus. I am going to do this outdoors, from many different angles and proximity's. I also want to do this in daylight so that the footage looks better, therefore I will do it either on a weekend day, or straight after school at about 3.30pm; so that I have as much natural light as possible when filming these sections. Going back to my storyboard, I know that I need close ups of lip syncing, and a variety of different lines from the song; mainly including 'your love is just a lie'. I also need to get footage on another day of Joanna and Connor together walking, therefore I will have to wait until next week to do that, as Joanna is currently on holiday. I have contacted Connor and he has said that he is available to film when I need to, therefore I am hoping to film within the next week to two weeks, so that I am able to complete my editing of my music video.

20/03/2012:
I have tested my video camera filming other things other than my music video, and changed the focus manually etc to test whether or not the grainy-ness of my footage is for a reason. When I watched the footage back on my laptop full screen, the footage was grainy as it was in my music video, therefore it is due to the camera quality rather than what settings I had put it on. I do not have time to film again with a different camera, so I will just have to leave the footage how it is, however there is a fault with the camera meaning I may have to return it to the store; however I will ensure that all my music video footage is uploaded onto the mac before I do this, so that the footage is consistent throughout my music video.

Continuing to Edit 7

I have continued with editing my music video together, and have added more shots with the chalkboard writing down the lyrics in time with the music. However, I need to film more footage before finishing the majority of my music video. As the deadline is approximately the 30th March, (The last day of term before the Easter break), I only have about three weeks left to complete the music video. This means that I will need to film within the next two weeks maximum, the next week preferably; so that I will be able to finish my music video in time.

Wednesday, 22 February 2012

Continuing to Edit 6

I continued to edit further into my music video today, and added a few more shots into final cut express. I am currently at the stage where I have edited up until the start of the second verse. However, I think that I will need some more footage to continue with editing my music video, therefore I have contact both Connor and Joanna; who have both agreed to take part in more filming. I am yet to arrange the dates for this, however I am planning to film in the next two weeks. In the meantime, I can still edit certain parts of my music video, I just may have to leave gaps in the timeline where I will need to insert new footage, and come back to this once I have recorded the footage.

Thursday, 9 February 2012

Continuing to Edit 5

I have spent a further hour or so editing my footage together and have now edited up until the end of the first chorus in the song. I am pleased with the way my music video is so far, as I have been making sure I cut the shots to the beat of the song, and so far the video is starting to tell a narrative like I had planned. I have used a combination of the narrative video footage and the chalkboard footage of the lyrics being written out to add interest to the video. I have used cross dissolve transitions on part of the footage again, to separate the black and white flashback to the rest of the footage. Below is a screenshot of what I have been editing in this lesson.

Wednesday, 8 February 2012

Importing the New Track

Today I have imported the same track without the glitch, and replaced it with the old one. I have checked the song and it is fine for the whole duration. I have swapped the tracks and made sure that the new track stays in time with my footage so that the video plays exactly in time to what it did with the other track. I am now able to continue with editing, past the point of the glitch which is where I stopped editing last time.

Tuesday, 7 February 2012

Continuing to Edit 4

I have carried on editing my music video in todays lesson, and swapped some different shots around so that they fit in time with the music better. I have also added three different shots of an argument scene between the two main characters. I have used the cross dissolve transition in between these shots as they are all from different angles and otherwise it would make it look like the continuity of the footage is wrong. I will continue editing on Thursday this week in the double lesson where I will hopefully get quite a lot of the video edited together.

Postponing Filming Due to Snow

As the only footage I have yet to collect is all filmed outside, I will not be able to film yet. This is because it has snowed heavily and this would affect the continuity of the film. Once the snow has cleared up and the weather is similar to how it is in my other footage, I will be able to film the rest of my music video. This will most likely be in approximately two weeks, when my cast are free to film, and the snow has gone.

Friday, 3 February 2012

Continuing to Edit 3

I have continued with my editing today, and have changed some of the more grainy/blurry shots for some more focused ones. I have also added a flashback shot and altered the colour of this to black and white and have put a slight slow motion affect on this to suggest that it is a memory. I am still yet to swap my track for one without a glitch, but as soon as I have done this I can continue to edit further.